
Infrastructure
National projects
Project Description
Two 1,200 m long and 7.4 m wide railway bridges rest on 24 giant pillars at spans of 55 m each and heights of 30-35 m.
The concrete castings in the project were carried out using an advanced and self-propelled hydraulic molding system (MSS molds).
Interested in asking a question or share information with us?
Write to us and we will get back to you as soon as possible.