High-speed
Train Tunnel to Jerusalem

Project details
Latrun
Location
Israel Railways
Client
Delivered
Status

Project Description

A pair of parallel underground tunnels approximately 3.5 km long and connecting tunnels approximately 350 square meters long.

A project with exceptional engineering challenges. The tunneling was carried out utilizing a SHIELDEPB TBM type. The connecting tunnels will be tunneled by a conventional method.

The project is being carried out with the Russian Moscow Metrostroy company.

Contact us

Interested in asking a question or share information with us?
Write to us and we will get back to you as soon as possible.

    *The fields marked with an asterisk are mandatory.