Ben-Gurion International Airport, Lod

Project details
Lod
Location
Israel Airports Authority
Client
Delivered
Status

Project Description

17,000 m2 Arm E 150,000 m2 Paving and training of the eastern runways

One of the most advanced terminals in the world including: a round duty free structure with ceiling made from of an upside-down steel bowl weighing 1,750 tons with a large fountain in the center; A 200 meter long, beautiful structure connecting the air and land terminals; an air terminal with sleeves, capable of connecting to 24 different airplanes simultaneously, including conveyors and escalators. The project was built to the highest standards.

Contact us

Interested in asking a question or share information with us?
Write to us and we will get back to you as soon as possible.

    *The fields marked with an asterisk are mandatory.