Infrastructure
National projects
Project Description
The structure was constructed using the cut & cover method (C&C). It included inter-alia heavy structural construction, groundwater pumping, infrastructure relocation, and excavation to the floor level employing the top-down method.
Because the entire project was carried out along major roadways where the traffic flowed throughout the work, the company bore responsibility for executing traffic arrangements and diverting the vehicular traffic.