Ben Gurion Airport – Modi’in Railway

Project details
Lod Interchange
Location
Israel Railways Ltd
Client
Delivered
Status

Project Description

Construction of three railway bridges for a total length of 1,160 square meters, track infrastructure and special development in the Lod interchange area.

The bridges built are beam bridges with 10 very large spans of 33 meters each. The bridges were built using advanced jacking technologies and the pre-tensioning method combined with site tensioning.

Contact us

Interested in asking a question or share information with us?
Write to us and we will get back to you as soon as possible.

    *The fields marked with an asterisk are mandatory.